Showing posts with label UFO. Show all posts
Showing posts with label UFO. Show all posts
Monday, October 15, 2007

Knitting on the Car Trip

Knitting in the Car

This weekend, Scott, Danny and I headed up to Vancouver for a wedding. I was extra excited because this meant that I had six hours of potential knitting (three up and three back). I decided that it was time to tackle my Project Spectrum sock.

Car Knitting

I made it to the heel and I'm crusing along. Of course I haven't hit that magic sock point where you knit and knit and knit and make NO progress. Right now I'm making progress and loving it.
Wednesday, September 12, 2007

UFO Check-In

I feel as if my entire focus has becoming finishing my UFOs so that I can start a new project. It is a vicious cycle.

So far I've completed the Irish Hiking Scarf and the Baby Hat. I also ripped out the Dublin Bay Socks since the yarn wasn't playing nice. This leaves me with 14 items to finish.

Hilltop Wrap

Finish Knitting up!
1. Hilltop Wrap -- I've been knitting on this all week (breaking the 48 hour rule because I can't help myself) and am down to two skeins. I have a long drive down to Portland this weekend, I see knitting and finishing coming up soon!
2. Kidsilk Scarf
3. Touring Wrap
4. Harry Potter Scarf
5. Chevron Scarf
6. Alterknits Scarf/Shawl
7. Scoutj Knee High Socks
8. Project Spectrum Cabled Socks

Items to be assembled:
1. Louisa Harding Plush Toy
2. Clothspin Bag
3. The Darn Purple Sweater
4. TKGA Master Knitter I

Items to deal with later:
1. Mitered Square Blanket
2. Mariah

The process
Must finish UFOs so I can start knitting a new sweater or two!
Monday, August 27, 2007

Tackling the UFOs

Hilltop Wrapping

Elizabeth of Gee You Knit! gave me great ideas for how to tackle my UFOs. She suggested that I work on the Mitered Square Blanket when I was sick of everything else (Elizabeth, it's for me so no deadline), ONLY carry socks with me and work on them when I'm out and about and finally give all my other projects 48 hours of focus before rotating onto another project.

I love these ideas! It keeps me working on my projects and admitting that I don't have the proper focus to work on one thing at once. I just don't, I get distracted by shiny things so easily!

August 6, 2007

Now my only adjustment to this idea is that I'm going to take a few items out of rotation and work on them only after I whittle my UFO list down to less than three items. Also items with assembly only needs will be dealt with in one session.

Items for 48 hour rotation:
1. Hilltop Wrap
2. Irish Hiking Scarf
3. Kidsilk Scarf
4. Baby Hat
5. Touring Wrap
6. Harry Potter Scarf
7. Chevron Scarf
8. Alterknits Scarf/Shawl

Items to carry with me:
1. Dublin Bay Socks
2. Scoutj Knee High Socks
3. Project Spectrum Cabled Socks

Mariah Sweater Sleeves

Items to be assembled:
1. Louisa Harding Plush Toy
2. Clothspin Bag
3. The Darn Purple Sweater
4. TKGA Master Knitter I

Items to deal with later:
1. Mitered Square Blanket
2. Mariah

UFO Status -- Part Two

Part two of the UFO freak-out session is here! Tomorrow I will discuss my plans to deal with these UFOs. Reader Elizabeth had some great advice that I plan to follow (with a few Supergirl adjustments).

Hilltop Wrap

1. Hilltop Wrap -- I'm about halfway done with this project. Unfortunately I'm a bit lost as to where I am in the project so this one will require some thinking before I can start knitting on it again.

Mariah Sweater Sleeves

Mariah Sleeves

2. Mariah -- I'm about 4 inches into the sleeves which are the most complex of this project. However like the Hilltop Wrap, I need to locate my starting point again. Yikes!

The Damn Purple Sweater

3. The Darn Purple Sweater -- I just need to seam up the arms and do a bit of finishing on this. I think I'll need to take it to a finisher.

Irish Hiking Scarf

4. Irish Hiking Scarf -- I'm about halfway done with this scarf and I love the pattern. I just need to liberate my size eight needles from another project and start knitting on this again. I guess I could always buy more size eight needles if that helps me work on this again.

Kidsilk Scarf

5. Kidsilk Scarf -- This was a free present from Rowan which I started when Harry Potter 6 came out. I really need to get cracking on this one again. I love this pattern. It's so simple in its complexity.

Baby Hat

6. Baby Hat -- I started this hat two jobs and a few years ago when a co-worker had a premie baby. The kid is now in preschool or something. I need to finish up this hat but there is no rush. It's for a premie and luckily I don't know any right now. I'm sure I'll be able to donate this hat when I'm done.

Scoutj Halloween Socks

7. Scoutj Knee High Socks -- I'm through the inital ribbing and am into the leg. This is the pattern that January One uses for knee highs but it's a bit too smart for me so I'm struggling with it. I'll make it through eventually!

So that's it -- 17 UFOs. Whew that is a ton!

Now before you think that I just start projects, I have finished one too!

I finished the Orange Scarf which will be a birthday present for a co-worker. I love how it turned out.

Orange Leaf Scarf

Wearing the Orange Leaf Scarf
I'm making a face because it was super hot and the wool scarf was making me sweat!

Tomorrow -- the plan to attack UFOs and bring them to a reasonable level!
Thursday, August 23, 2007

UFO Status -- Part One

It's that time again, when I freak out because I have so many things on the needles and then SWEAR to finish them before casting on for anything else. It's a vicious cycle and we all know how it goes.

In an attempt to be honest about my UFO's, I'd take the time to list them with their status. I have so many that I'm breaking this post into two parts.

Mitering

1. Mitered Square Blanket -- I have knit 23 squares out of the 80 needed squares. Last night I cast on for my 24th square.

August 6, 2007

2. Touring Wrap -- I'm about three inches into this wrap. It's something that requires my attention when I knit so I haven't been working on it as much. I do still love the pattern though.

Harry Potter Scarf

3. Harry Potter Scarf -- I need 14 stripes total. I have 5-6 stripes completed. It's boring to knit this scarf but one day, I'll be done and it will be great to wear.

Start of Chevron

4. Chevron Scarf -- I've only knit about four inches on this scarf. It's an easy pattern but there is that one row that requires attention. It is slowing me down.

Alterknit Shawl Scarf

5. Alterknits Scarf/Shawl -- I'm about 10 inches into the scarf. I love this yarn. I love this pattern. I just need to make time to knit it.

TKGA Swatches Blockin

6. TKGA Master Knitter I -- I totally missed my one year deadline and now need to readjust this project based on the new directions. Shouldn't be too hard. I need to give myself a new deadline.

Birdie Pieces

7. Louisa Harding Plush Toy -- This toy is knitted and just needs to be assembled. Shouldn't be that hard but I just can't seem to get it DONE!

Project Spectrum Socks

8. Project Spectrum Cabled Socks -- I started these back in February and haven't knit on them since. This is my favorite sock pattern so one they are complete, I know that I'll love wearing them.

Dublin Bay Socks

9. Dublin Bay Socks -- I'm on the foot of the first sock. The part where you knit round and round measuring every 10 minutes and never getting close to the desired measurement. Yep, that part.

Clothespin Bag

10. Clothspin Bag -- I've knitted up the pieces for this bag and have cut out the fabric. I just need to get the right sized hanger and assemble this sucker!

Tomorrow, part deux. Yes! I do have many more UFO's at home. Frightening!
 
Rebecca Mongrain's Blog © 2013.

Design by The Blog Boat